S9300&S9300E Terabit Routing Switch
Configuration Guide - Network Management
Figure 6-16 Networking diagram of a LSP jitter test
SwitchA
Configuration Roadmap
The configuration roadmap is as follows:
1.
2.
Data Preparation
To complete the configuration, you need the number of the MPLS TE tunnel interface.
Procedure
Step 1 Configure routes between Switch A, Switch B, and Switch C. (The detailed procedure is not
mentioned here.)
Step 2 Configure MPLS RSVP-TE on Switch A, Switch B, and Switch C. (The detailed procedure is
not mentioned here.)
For the configuration of MPLS RSVP-TE, refer to the S9300&S9300E Terabit Routing Switch
Configuration Guide - MPLS.
Step 3 Set up a TE tunnel from Switch A to Switch C. (The detailed procedure is not mentioned here.)
Step 4 Create an NQA test on Switch A.
# Enable the NQA client and create an LSP Jitter test for the TE tunnel.
<SwitchA> system-view
[SwitchA] nqa test-instance admin lspjitter
[SwitchA-nqa-admin-lspjitter] test-type lsptrace
[SwitchA-nqa-admin-lspjitter] lsp-type te
[SwitchA-nqa-admin-lspjitter] lsp-tetunnel tunnel 1/0/0
Step 5 Start the test.
Issue 01 (2012-03-15)
Loopback1
1.1.1.9/32
GE1/0/0
VLANIF100
VLANIF100
10.1.1.1/24
10.1.1.2/24
Configure Switch A as an NQA client.
Create an LSP Jitter test on Switch A.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
area 0
Loopback1
2.2.2.9/32
GE1/0/0
GE2/0/0
VLANIF110
10.2.1.1/24
SwitchB
6 NQA Configuration
Loopback1
3.3.3.9/32
GE1/0/0
VLANIF110
10.2.1.2/24