Huawei S9300 Configuration Manual page 474

Table of Contents

Advertisement

S9300&S9300E Terabit Routing Switch
Configuration Guide - Network Management
Figure 6-26 Networking diagram for configuring the PWE3 Trace test on a multi-hop PW
U-PE1
Configuration Roadmap
The configuration roadmap is as follows:
1.
2.
3.
4.
5.
Data Preparation
To complete the configuration, you need the following data:
l
l
l
l
l
Issue 01 (2012-03-15)
Loopback0
2.2.2.9/32
P1
GE1/0/0
GE2/0/0
VLANIF120
VLANIF130
10.1.1.2/24
20.1.1.1/24
Loopback0
1.1.1.9/32
GE2/0/0
VLANIF120
10.1.1.1/24
GE1/0/0
VLANIF110
GE1/0/0
VLANIF110
100.1.1.1/24
CE-A
Run the IGP protocol on the backbone network to make the routes between Switches on
the backbone network reachable.
Configure the basic MPLS functions on the backbone network and set up an LSP tunnel.
Set up MPLS LDP peer relations between U-PE1 and S-PE, and between U-PE2 and S-
PE.
Create an MPLS L2VC connection between the two U-PEs.
Create a switching PW on the switching node S-PE.
Configure a PWE3 Trace test on the multi-hop PW on U-PE1.
L2VC IDs on U-PE1 and U-PE2, which must be different
MPLS LSR-IDs of U-PE1, S-PE, and U-PE2
IP address of the remote peer
Encapsulation type of the switching PW
Name and parameters of the PW template on U-PE devices
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Loopback0
3.3.3.9/32
GE1/0/0
S-PE
VLANIF130
20.1.1.2/24
GE2/0/0
VLANIF140
30.1.1.1/24
6 NQA Configuration
Loopback0
4.4.4.9/32
GE1/0/0
P2
VLANIF140
30.1.1.2/24
GE2/0/0
VLANIF150
40.1.1.1/24
Loopback0
5.5.5.9/32
GE1/0/0
VLANIF150
40.1.1.2/24
GE2/0/0
VLANIF160
CE-B
U-PE2
GE1/0/0
VLANIF160
100.1.1.2/24
459

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents