Huawei S9300 Configuration Manual page 449

Table of Contents

Advertisement

S9300&S9300E Terabit Routing Switch
Configuration Guide - Network Management
Figure 6-21 Networking diagram for checking the multicast path from the multicast source to
the local Switch
Configuration Roadmap
The configuration roadmap is as follows:
1.
2.
Data Preparation
To complete the configuration, you need the following data:
l
l
l
l
Procedure
Step 1 Configure an NQA MTrace test on Switch C.
<SwitchC> system-view
[SwitchC] nqa test-instance admin mtrace
Issue 01 (2012-03-15)
Source
11.1.0.2/24
GE2/0/0
VLANIF150
11.1.1.2/24
Loopback0
1.1.1.1/32
GE2/0/0
VLANIF150
SwitchC
11.1.1.1/24
GE1/0/0
VLANIF160
11.1.3.2/24
GE1/0/0
VLANIF160
11.1.3.1/24
GE3/0/0
VLANIF170
11.1.6.2/24
Configure Switch C as the NQA client and create an MTrace test on it.
Perform the test and view the test result.
Test instance name: admin mtrace
IP address of the multicast source: 11.1.0.2/24
IP address of the destination host: 11.1.6.4
IP address of the Switch at the last hop: 11.1.6.2
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
GE1/0/0
VLANIF140
11.1.0.1/24
GE3/0/0
VLANIF130
11.1.2.2/24
SwitchE
VLANIF130
11.1.2.1/24
GE2/0/0
VLANIF120
11.1.4.2/24
SwitchB
GE2/0/0
VLANIF120
11.1.4.1/24
GE3/0/0
VLANIF170
11.1.6.3/24
Receiver
11.1.6.4/24
6 NQA Configuration
GE3/0/0
SwitchD
GE1/0/0
VLANIF110
11.1.5.2/24
GE1/0/0
VLANIF110
11.1.5.1/24
SwitchA
434

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents