Deploying And Provisioning Services; Phase 1: Core Network Construction; Phase 2: Service Administration; Phase 3: Service Provisioning - Alcatel-Lucent 7210 SAS M Service Manual

Hide thumbs Also See for 7210 SAS M:
Table of Contents

Advertisement

Deploying and Provisioning Services

The service model provides a logical and uniform way of constructing connectivity services. The
basic steps for deploying and provisioning services can be broken down into three phases.

Phase 1: Core Network Construction

Before the services are provisioned, the following tasks should be completed:

Phase 2: Service Administration

Perform preliminary policy configurations to control traffic flow, operator access, and to manage
fault conditions and alarm messages, the following tasks should be completed:

Phase 3: Service Provisioning

7210 SAS M Services Guide
Build the IP or IP/MPLS core network.
Configure routing protocols.
Configure MPLS LSPs (if MPLS is used).
Configure group and user access privileges.
Build templates for QoS, filter and/or accounting policies needed to support the core
services.
Provision customer account information.
If necessary, build any customer-specific QoS, filter or accounting policies.
Provision the customer services on the service edge routers by defining SAPs, binding
policies to the SAPs.
Services
Page 63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents