3.2.2 Maintenance schedule

General
The robot must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the following table.
Non-predictable situations also give rise to inspections of the robot. Any damages
must be attended to immediately!
The inspection intervals do not specify the life of each component. Values for these
are specified in the section
Instructions for how to perform the different maintenance activities are found in
sections:
Activities and intervals, standard equipment
The following table specifies the required maintenance activities and intervals.
Maintenance activity
Cleaning
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Change
Product manual - IRB 2600
3HAC035504-001 Revision: G
Inspection activities on page 121
Replacement / Changing activities on page 151
Cleaning on page 185
Equipment
Robot
Oil level in axis-1 gearbox
Oil level in axis-2 gearbox
Oil level in axis-3 gearbox
Oil level in axis-4 gearbox
Oil level in axis-5 gearbox
Oil level in axis-5-6 gearbox
Oil level in axis-5-6 gearbox
(ID)
Robot harness
Information labels
Dampers
Pressure relief valve
Mechanical stop
Oil in axis-1 gearbox
© Copyright 2009-2015 ABB. All rights reserved.
Expected component life on page 120
Interval
Cleaning the IRB 2600 on page 185
Every 12 months.
Every 12 months.
Every 12 months.
Every 12 months.
Every 12 months.
Every 12 months.
Every 12 months.
Every 12 months
Every 12 months.
Every 12 months.
Every 12 months
Every 12 months.
First change when DTC
Second change when DTC
Following changes:
3 Maintenance
3.2.2 Maintenance schedule
i
.
ii
.
iii
reads:
6,000 hours
iii
24,000 hours
Every 24,000 hours.
Continues on next page
reads:
117