ABB IRB 2600 Product Manual page 260

Hide thumbs Also See for IRB 2600:
Table of Contents

Advertisement

4 Repair
4.4.2 Replacing complete tubular shaft unit
Continued
5
6
7
8
9
10
11
Continues on next page
260
Action
Place the cable package in a way that it will
not be damaged in the continued removal
procedure.
Remove motors axes 4, 5 and 6.
Tip
If only the tubular shaft unit shall be re-
placed, it is a good idea to remove the wrist
unit at this stage.
CAUTION
The robot arm tube weighs 30 kg.
All lifting accessories used must be sized
accordingly!
Secure the tubular shaft unit with round-
slings in an overhead crane.
CAUTION
Prevent the slings from sliding!
For example a small plate can be fitted to
the lower attachment hole for the cable
bracket (removed in a previous step). The
plate should be fitted so it points down-
wards and functions as a mechanical stop
for the roundsling.
At the other end of the tubular shaft unit, a
shackle can be fitted if the wrist unit is re-
moved.
Remove the attachment screws that secure
the tubular shaft unit.
Remove the tubular shaft unit using caution.
The tubular shaft unit is fitted with Loctite.
CAUTION
Do not damage the gears when removing
the tubular shaft unit.
CAUTION
Remaining oil will drain out from the gear-
box cavity when the tubular shaft is lifted
out.
© Copyright 2009-2015 ABB. All rights reserved.
Note
How to remove motors is described in
section:
Removing motors on page 286
How to remove the wrist unit is detailed
in section:
Removal of wrist unit on page 265
See the figure in:
Location of tubular shaft unit on
page 258
Note
There are two parallel pins guiding the
tubular shaft unit into its place. See figure
in
Replacing complete tubular shaft unit
on page
258.
Product manual - IRB 2600
3HAC035504-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents