ABB IRB 2600 Product Manual page 262

Hide thumbs Also See for IRB 2600:
Table of Contents

Advertisement

4 Repair
4.4.2 Replacing complete tubular shaft unit
Continued
5
6
7
8
9
10
11
Continues on next page
262
Action
Secure the tubular shaft unit with a round-
sling in an overhead crane.
CAUTION
Prevent the slings from sliding!
For example a small plate can be fitted to
the lower attachment hole for the cable
bracket (removed in a previous step). The
plate should be fitted so it points down-
wards and functions as a mechanical stop
for the roundsling.
At the other end of the tubular shaft unit, a
shackle can be fitted if the wrist unit is re-
moved.
Fit guide pins in the upper arm house.
Refit the tubular shaft unit, using caution.
CAUTION
Do not damage the gears when refitting the
tubular shaft unit.
Secure the tubular shaft unit with its attach-
ment screws.
Refit motors axes 4, 5 and 6.
Perform a leak-down test.
Refit the bracket securing the cable package
to the tubular shaft unit, with its attachment
screws.
© Copyright 2009-2015 ABB. All rights reserved.
Note
Specified in
Required equipment on
page
258.
Note
There are two parallel pins guiding the
tubular shaft unit into its place.
See the figure in:
Location of tubular shaft unit on
page 258
Tightening torque: 22 Nm
How to refit motors is described in sec-
tion:
Refitting motors on page 298
See
Performing a leak-down test on
page
190.
xx0800000335
Parts:
A: Tubular shaft unit
B: Attachment screws M6x16 qual-
ity 8.8-A2F (2 pcs)
C: Bracket
Product manual - IRB 2600
3HAC035504-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents