ABB IRB 2600 Product Manual page 347

Hide thumbs Also See for IRB 2600:
Table of Contents

Advertisement

4
5
6
7
Product manual - IRB 2600
3HAC035504-001 Revision: G
Action
Loosen the cabling from the lower arm
by removing two cable brackets and a
cable strap.
Attach a roundsling around the upper
arm house.
Unload the weight of the lower and
upper arm package by stretching the
roundslings with the overhead crane.
Turn on the power temporarily and re-
lease the brakes of axis 2 to rest the
weight onto the roundslings.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
© Copyright 2009-2015 ABB. All rights reserved.
4.8.2 Replacing gearbox axis 2
Note
C
xx1100000946
A Cable bracket
B Cable bracket
C Cable strap
Continues on next page
4 Repair
Continued
B
A
347

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents