10 Maintenance
10.11 Test exposures/Test images
440
"Control exposures"
9. Call the
10. In the structure tree, under
- quality control exposure"
In the action area, the menu appears to create the
control exposure"
"Start acquisition"
11. Click on the
Exposure readiness is established. A dialog window displays the
status of readiness to exposure.
The service routine used for the corresponding exposure is
displayed on the control panel, along with the specific exposure
parameters.
12. Press the release button. Press and hold down the button until the
exposure is complete, the preview image is displayed in the exposure
window, and the acoustic signal that indicates the end of the
exposure (double beep) sounds (if it has been configured).
The exposure is displayed in the exposure window.
For notes on evaluating the exposure, refer to the technical
documentation for acceptance/constancy testing.
Sirona Dental Systems GmbH
Service Manual ORTHOPHOS SL
menu [ → 428].
"2D control exposures"
element.
.
button.
D3632.076.01.03.02 09.2016
"Ceph
, select the
"Ceph - quality
64 95 258 D3632