Ntp- G14 Install Dwdm Equipment - Cisco ONS 15454 DWDM Installation And Operation Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

NTP-G14 Install DWDM Equipment
NTP-G14 Install DWDM Equipment
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Step 2
Complete the
Step 3
Complete the
Step 4
Complete the
Complete the
Step 5
Note
Complete the
Step 6
Complete the
Step 7
Stop. You have completed this procedure.
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
1-66
This procedure installs the optional DWDM assemblies.
#2 Phillips screwdriver
Crimping tool (large enough for #10 to #14 AWG)
#14 AWG wire
NTP-G2 Install the Shelf Assembly, page 1-8
As needed
Onsite
None
"DLP-G27 Install the DCU Shelf Assembly" task on page 1-67
"DLP-G28 Install the Fiber Patch-Panel Tray" task on page 1-67
"DLP-G29 Install the Fiber-Storage Tray" task on page 1-68
"DLP-G8 Install the Air Ramp" task on page 1-19
"DLP-G30 Install the FlexLayer Shelf" task on page 1-68
Procedures for installing FlexLayer hardware in this chapter require that you have a network
plan calculated for your DWDM network with Cisco MetroPlanner, Release 2.5. MetroPlanner
is a DWDM planning tool that is available your Cisco account representative. MetroPlanner
prepares a shelf plan for each network node and calculates the power and attenuation levels for
the DWDM cards installed in the node. For information about Cisco MetroPlanner, refer to the
Cisco MetroPlanner DWDM Operations Guide, Release 2.5.
"DLP-G31 Install the FlexLayer Modules" task on page 1-69
"DLP-G32 Install the Y-Cable Protection Modules" task on page 1-70
Chapter 1
Install the Shelf and Common Control Cards
as needed.