Ntp- G52 Verify Node-To-Node Connections - Cisco ONS 15454 DWDM Installation And Operation Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

Chapter 6
Turn Up Network
NTP-G52 Verify Node-to-Node Connections
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Check to see if fiber is connected to the OPT-BST or OSC-CSM LINE RX and TX ports. If yes, continue
Step 1
with
a.
b.
Verify the network fiber connections:
Step 2
Step 3
Complete the
Click the Provisioning > Comm Channels > OSC tabs. Verify that OSC terminations were created for
Step 4
the east and west OSC-CSM or OSCM cards and that the port state is In-Service and Normal (IS-NR
[ANSI])/Unlocked-enabled (ETSI). If so, continue with
complete the
Step 5
Complete the
span loss is within the minimum and maximum expected span loss values, continue with
clean the fiber connected to the OPT-BST or OSC-CSM on both ends of the span, then repeat the
"NTP-G76 Verify Optical Span Loss Using CTC" task on page
minimum and maximum expected span loss values, continue with
of support.
Repeat Steps
Step 6
Stop. You have completed this procedure.
September 2005
This procedure verifies optical service channel (OSC) terminations
between nodes and checks span attenuation. This procedure applies to all
ROADM, OADM, and line amplifier locations.
None
NTP-G51 Verify DWDM Node Turn-Up, page 6-2
Required
Onsite or remote
Provisioning or higher
Step
2. If not, complete the following tasks:
Clean the fiber using the
Install the fiber using the
"DLP-G65 Install Fiber-Optic Cables for OSC Link Terminations Between
Two Adjacent Nodes" task on page
The east Line TX ports connect to the west Line RX ports of the adjacent node.
The west Line RX ports connect to the east Line TX ports of the adjacent node.
The west Line TX ports connect to the east Line RX ports of the adjacent node.
The east Line RX ports connect to the west Line TX ports of the adjacent node.
"DLP-G46 Log into CTC" task on page 2-25
"NTP-G38 Provision OSC Terminations" procedure on page
"NTP-G76 Verify Optical Span Loss Using CTC" procedure on page
2
through
5
at each network node.
"NTP-G115 Clean Fiber Connectors" procedure on page
3-51.
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
NTP-G52 Verify Node-to-Node Connections
at a network node.
Step
5. If OSC terminations are not created,
3-84.
10-2. If the span loss is within the
Step
6. If not, contact your next level
13-25.
10-2. If the measured
Step
6. If not,
6-3

Advertisement

Table of Contents
loading

Table of Contents