NTP-G41 Perform the Terminal or Hub Node with 32MUX-O and 32DMX-O Cards Acceptance Test
9.
10.
NTP-G41 Perform the Terminal or Hub Node with 32MUX-O and
32DMX-O Cards Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
This procedure tests the west side of hub nodes first, then the east side. If you are testing a terminal node,
Note
apply instructions for the west side of the hub node to the terminal side (east or west) of the terminal
node.
Complete the
Step 1
test. If you are already logged in, continue with
From the View menu, choose Go to Network View.
Step 2
Click the Alarms tab.
Step 3
a.
b.
Step 4
In node view, click the Provisioning > WDM-ANS > Port Status tabs. Verify that all statuses under
Link Status are listed as Success - Changed, Success - Unchanged, or Not Applicable. If any are not,
complete the
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
4-2
NTP-G49 Perform the OADM Active Node Acceptance Test on a Symmetric Node with OSC-CSM
Cards, page
4-36—Complete this procedure to test OADM nodes with OSC-CSM and OPT-BST
cards installed on both the east and west sides of the shelf.
NTP-G50 Perform the OADM Passive Node Acceptance Test on a Symmetric Node with OSC-CSM
Cards, page
4-38—Complete this procedure to test OADM nodes with OSC-CSM cards installed on
both the east and west sides of the shelf and no OPT-BST cards.
This procedure tests a DWDM terminal or hub node with 32MUX-O and
32DMX-O cards.
A tunable laser or eight TXP_MR_2.5G cards covering the 32 C-band
wavelengths (see
An optical power meter or optical spectrum analyzer
2 bulk attenuators (10 dB) with LC connectors
Chapter 3, "Turn Up a Node"
Required
Onsite
Superuser
"DLP-G46 Log into CTC" task on page 2-25
Verify that the alarm filter is not on. See the
as necessary.
Verify that no equipment (EQPT) alarms appear indicating equipment failure or other hardware
problems. If equipment failure alarms appear, investigate and resolve them before continuing. Refer
to the Cisco ONS 15454 Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting
Guide for procedures.
If optical service channel (OSC) terminations are created, there will be two alarms, one for
Note
low power on the OPT-BST card, and the other an OSC channel alarm.
"NTP-G37 Run Automatic Node Setup" procedure on page
Chapter 4
Table
4-1)
at the hub or terminal node that you want to
Step
2.
"DLP-G128 Disable Alarm Filtering" task on page 8-28
Perform Node Acceptance Tests
3-83.
September 2005