NTP-G38 Provision OSC Terminations
Stop. You have completed this procedure.
NTP-G38 Provision OSC Terminations
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
OSC terminations. If you are already logged in, continue with
In node view, click the Provisioning > Comm Channels > OSC tabs.
Step 2
In the OSC Terminations area, click Create
Step 3
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
3-84
Fail - Out of Range—The calculated setpoint is outside the expected range. Repeat the
Calculate Cable Connections" procedure on page 3-80
provisioned correctly, paying attention to connections that require manual provisioning.
The Fail - Out of Range condition must be cleared before proceeding. Contact your next
Note
level of support if you are unable to clear this status.
Fail - Port in IS State—The parameter could not be calculated because the port is in service. This
status should normally not appear at this point in node turn-up. If it does, display the card in card
view, change the port administrative state to OOS,DSLB (ANSI) or Locked,disabled (ETSI), and
repeat Steps
6
through 11.
This procedure provisions the OSC terminations.
None
NTP-G138 Import a Cisco MetroPlanner Configuration File, page 3-82
Required
Onsite or remote
Superuser
"DLP-G46 Log into CTC" task on page 2-25
to verify that all connections were
at the node where you want to provision the
Step
2.
(Figure
3-22).
Chapter 3
Turn Up a Node
"NTP-G36
September 2005