Dlp- G68 Install Fiber-Optic Cables For A Line Amplifier Node - Cisco ONS 15454 DWDM Installation And Operation Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

DLP-G68 Install Fiber-Optic Cables for a Line Amplifier Node
DLP-G68 Install Fiber-Optic Cables for a Line Amplifier Node
Purpose
Tools
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Throughout this task, west refers to Slots 1 through 8, and east refers to Slots 10 through 17.
Note
Refer to the Cisco MetroPlanner Internal Connections table (see
Step 1
when completing connections. Before you begin the line amplifier node connections, read the following
rules:
Figure 3-12
Note
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
3-58
This task installs fiber-optic cables on a line amplifier node in a DWDM
shelf.
Fiber-optic cables
NTP-G115 Clean Fiber Connectors, page 13-25
NTP-G139 Verify Cisco MetroPlanner Reports and Files, page 3-3
As needed
Onsite
None
Line amplifier node layout allows all combinations of OPT-PRE and OPT-BST and allows you to
use asymmetrical card choices in west-to-east and east-to-west configurations. For a given line
direction, you can configure the four following possibilities:
Only preamplification (OPT-PRE)
Only booster amplification (OPT-BST)
Both preamplification and booster amplification (where a line amplifier node has amplification
in at least one direction)
Neither preamplification nor booster amplification
If a west OPT-PRE card is installed:
The west OSC-CSM or OPT-BST COM TX is connected to the west OPT-PRE COM RX port.
The west OPT-PRE COM TX port is connected to the east OSC-CSM or OPT-BST COM RX
port.
If a west OPT-PRE card is not installed, the west OSC-CSM or the OPT-BST COM TX port is
connected to the east OSC-CSM or OPT-BST COM RX port.
If an east OPT-PRE card is installed:
The east OSC-CSM or OPT-BST COM TX port is connected to the east OPT-PRE COM RX
port.
The east OPT-PRE COM TX port is connected to the west OSC-CSM or OPT-BST COM RX
port.
If an east OPT-PRE card is not installed, the east OSC-CSM or OPT-BST COM TX port is connected
to the west OSC-CSM or OPT-BST COM RX port.
shows an example of a line amplifier node with cabling.
Figure 3-12
is an example. Always install fiber-optic cables based on the Cisco MetroPlanner
Internal Connections table for your site.
Chapter 3
Turn Up a Node
Table 3-1 on page
3-3) for your site
September 2005

Advertisement

Table of Contents
loading

Table of Contents