DLP-G159 Refresh Automatic Power Control Information
Purpose
Tools/Equipment
Prerequisite Procedures All procedures in the following chapters:
Required/As Needed
Onsite/Remote
Security Level
In node view, click the Maintenance > DWDM > APC tabs.
Step 1
Click Refresh.
Step 2
Return to your originating procedure (NTP).
Step 3
NTP-G78 View ROADM Node Power Equalization
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Complete the
Step 2.
In node view, click the Maintenance > DWDM > ROADM Power Monitoring tabs.
Step 2
Step 3
On the Power Monitoring tab, view the following east-to-west (E > W) and west-to-east (W > E) power
information:
September 2005
This task refreshes the DWDM APC information.
A node provisioning plan prepared by Cisco MetroPlanner is required.
Chapter 3, "Turn Up a Node"
Chapter 6, "Turn Up Network"
DLP-G46 Log into CTC, page 2-25
As needed
Onsite or remote
Superuser
This procedure allows you to view ROADM node power equalization
levels.
None
DLP-G46 Log into CTC, page 2-25
As needed
Onsite or remote
Superuser
"DLP-G46 Log into CTC" task on page
Padd—Add power. This power level is represented by the red bar.
Ppt—Pass-through power. This power level is represented by the yellow bar.
Pout—Output power. This power level is represented by the blue bar. It shows the per-channel
(wavelength) power at the 32WSS output (COM_TX) port.
DLP-G159 Refresh Automatic Power Control Information
2-25. If you are already logged in, continue with
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
10-5

Advertisement

Table of Contents
loading

Table of Contents