DLP-G274 Verify Topologies for ETR_CLO and ISC Services
DLP-G274 Verify Topologies for ETR_CLO and ISC Services
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
Display your site plan in Cisco MetroPlanner.
Verify that the topology where you plan to run the ETR_CLO or ISC service is one of the topologies that
Step 2
supports these services:
Figure 5-1
Site 1
Figure 5-2
Site 1
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
5-4
This task verifies that the DWDM network topology can support the IBM
ETR_CLO and ISC services. These services cannot be provisioned on all
DWDM topologies.
Cisco MetroPlanner site plan.
As needed
Onsite or remote
Provisioning or higher
Single span—Two terminal sites with no intermediate sites in between and the following cards
installed:
32MUX-O and 32DMX-O cards
32WSS and 32DMX cards
32WSS and 32-DMX-O cards
Figure 5-1
shows a single-span topology as displayed in Cisco MetroPlanner.
Single-Span Topology
W
Point-to-Point—Two terminal sites with the following cards installed:
32MUX-O and 32DMX-O cards
32WSS and 32DMX cards
32WSS and 32-DMX-O cards
Line amplifiers can be installed between the terminal sites, but intermediate (traffic terminating)
sites cannot be installed.
Figure 5-2
Cisco MetroPlanner.
Point-to-Point Topology
Site 2
E
W
E
Chapter 5
Provision Transponder and Muxponder Cards
E
Site 4
shows a point-to-point topology as shown in
Site 3
W
E
W
Site 4
September 2005