DLP-G78 Verify the 32MUX-O Power
DLP-G78 Verify the 32MUX-O Power
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Display the 32MUX-O in card view.
Step 2
Click the Provisioning > Optical Chn > Parameters tabs.
Change the Admin State of the correspondent port to OOS,MT (ANSI) or Locked,maintenance (ETSI).
Step 3
Check that the power value on the port reaches the provisioned setpoint (VOA Power Ref).
Step 4
Return to your originating procedure (NTP).
Step 5
DLP-G79 Verify the OPT-BST Amplifier Laser and Power
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
In node view, double-click the OPT-BST amplifier to display the card view.
Step 1
Click the Maintenance > ALS tabs. If the value in the Currently Shutdown field is NO, continue with
Step 2
Step
a.
b.
Click the Provisioning > Opt Ampli Line > Parameters tabs.
Step 3
Click Reset.
Step 4
Scroll to the right and locate the Signal Output Power parameter for Port 6. Verify that the Signal Output
Step 5
Power value is greater than or equal to 1.5 dBm.
If the Signal Output Power is not greater than or equal to 1.5 dBm, do not continue. Begin
troubleshooting or contact your next level of support.
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
4-40
This task verifies 32MUX-O power.
None
DLP-G46 Log into CTC, page 2-25
As needed
Onsite or remote
Superuser
This task verifies that the OPT-BST amplifier laser is on and provisioned
to the correct power.
None
DLP-G46 Log into CTC, page 2-25
As needed
Onsite or remote
Superuser
3. If not, complete the following steps:
Check the optical safety remote interlock (OSRI) setting. If it is set to On, change it to Off and click
Apply.
Check the Currently Shutdown field. If it changes to NO, continue with
next level of support. The amplifier might need to be replaced.
Chapter 4
Perform Node Acceptance Tests