Cisco ONS 15454 DWDM Installation And Operation Manual page 337

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

Chapter 4
Perform Node Acceptance Tests
Step 8
Change the administrative state of the drop BAND TX port related to the wavelength selected on the
tunable laser to OOS,MT.
(Optional) Connect a power meter to the proper 15xx.xs TX port on the front panel (the dual port
Step 9
compared with the port where the tunable laser is connected). Verify that the physical optical power
value from that port is consistent with the value displayed on the Provisioning > Optical Chn >
Parameters tab for the proper CHAN TX power value, +/– 0.5 dB.
Verify the west AD-xC-xx.x (west-to-east) card:
Step 10
a.
Display the west AD-xC-xx.x card in card view.
b.
Click the Provisioning > Optical Chn > Parameters tabs.
Verify that the Power value of the CHAN TX port is higher than the default no-power value of
c.
–35 dBm.
d.
Display the east AD-xC-xx.x card in card view.
e.
Click the Provisioning > Optical Chn > Parameters tabs.
Verify that the power value for the CHAN TX port is higher than the default no-power value of
f.
–35 dBm.
g.
If the AD-xC-xx.x card is an AD-4C-xx.x card, a VOA (applied to all four channels) is installed
along the drop path and needs to be activated in Step h.
Change the Admin State of the CHAN TX port related to the wavelength selected on the tunable
h.
laser to OOS,MT (ANSI) or Locked,maintenance (ETSI). Click Apply.
Perform the output power check.
i.
(Optional) Connect a power meter to the proper 15xx.xx TX port on the front panel (the dual port
Step 11
compared with the port where the tunable laser is connected). Verify that the physical optical power
value from that port is consistent with the value on Provisioning > Optical Chn > Parameters tab for the
proper CHAN TX power value, +/– 0.5 dB.
Repeat Steps
Step 12
east-to-west direction.
Remove the loopback on the west OSC-CSM card.
Step 13
In node view, click the Provisioning > WDM-ANS > Port Status tabs.
Step 14
Click Launch ANS.
Step 15
Create a loopback on the east OSC-CSM card by connecting the OSC-CSM LINE RX and LINE TX
Step 16
ports using a patchcord and 10-dB bulk attenuator.
Verify that the OSC link becomes active on the west OSC-CSM card. (The OSC termination must be
Step 17
already provisioned. If not, complete the
page
Note
If the OSC link becomes active, continue with
Step 18
following troubleshooting steps:
Remove the 10-dB bulk attenuator between the LINE TX and LINE RX connection. If the OSC link
a.
becomes active, continue with
b.
Modify the OSC Fail Low thresholds. Click the Provisioning > Optical Line > Optics Thresholds
tabs and change the Port 6 opwrMin (minimum power) to –40 dBm.
September 2005
8
through
11
for all add paths of any west AD-xC-xx.x or 4MD-xx.x cards along the
3-84.)
Due to the OSC signal loopback, an SDCC Termination Failure alarm might be raised.
DLP-G94 Verify Add and Drop Connections on OADM Node with OSC-CSM Cards
"NTP-G38 Provision OSC Terminations" procedure on
Step
19. If the OSC link does not turn up, perform the
Step
19. If not, continue with Step b.
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
4-57

Advertisement

Table of Contents
loading

Table of Contents