Cisco ONS 15454 DWDM Installation And Operation Manual page 49

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

Install the Shelf and Common Control Cards
NTP-G1 Unpack and Inspect the Shelf Assembly
NTP-G2 Install the Shelf Assembly
NTP-G3 Open and Remove the Front Door
NTP-G4 Open and Remove the FMEC Cover (ETSI Only)
NTP-G5 Remove the Backplane Covers (ANSI Only)
NTP-G6 Install the MIC-A/P and MIC-T/C/P FMECs (ETSI Only)
NTP-G7 Install the Power and Ground
NTP-G8 Install the Fan-Tray Assembly
NTP-G9 Install the Alarm Expansion Panel (ANSI Only)
NTP-G10 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections
NTP-G11 Install an External Wire-Wrap Panel on the AEP (ANSI Only)
NTP-G12 Install and Close the FMEC Cover (ETSI Only)
NTP-G13 Install the Rear Cover (ANSI Only)
NTP-G14 Install DWDM Equipment
NTP-G15 Install the Common Control Cards
NTP-G16 Perform the Shelf Installation Acceptance Test
Connect the PC and Log into the GUI
NTP-G17 Set Up Computer for CTC
NTP-G18 Set Up CTC Computer for Local Craft Connection to the ONS 15454
NTP-G19 Set Up a CTC Computer for a Corporate LAN Connection to the ONS 15454
NTP-G20 Set Up a Remote Access Connection to the ONS 15454
NTP-G21 Log into the ONS 15454 GUI
Turn Up a Node
NTP-G139 Verify Cisco MetroPlanner Reports and Files
NTP-G22 Verify Common Card Installation
NTP-G23 Create Users and Assign Security
NTP-G24 Set Up Name, Date, Time, and Contact Information
NTP-G25 Set Power Monitor Thresholds
NTP-G26 Set Up CTC Network Access
NTP-G27 Set Up the ONS 15454 for Firewall Access
August 2005
1-8
1-20
1-30
1-40
1-64
1-66
1-71
2-1
2-2
2-24
3-1
3-4
3-5
3-10
3-11
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
P R O C E D U R E S
1-1
1-6
1-23
1-26
1-28
1-44
1-47
1-58
1-63
1-76
2-23
3-3
3-8
3-23
2-9
2-21
xlix

Advertisement

Table of Contents
loading

Table of Contents