NTP-G34 Install Fiber-Optic Cables on DWDM Cards and DCUs
Unit-2—The ONS 15454 DWDM card (unit) that is installed in the Position-2 slot.
Port #2—The port identifier shown in CTC for the first Position-2 connection.
Port ID-2—The port identifier shown in TL1 for the Position-2 connection.
Port Label-2—The name of the physical port printed on the card's front plate and shown in CTC
card view for the Position-2 connection.
Manually Set—Indicates whether you must create the connection manually in CTC. A Yes
appearing in this column means that you must create the connection manually.
Failure to create the required manual connections will prevent the node from turning up properly.
Caution
Verify that fibers are available to complete the connections shown in the Internal Connections table.
Step 3
Complete the
Step 4
even new fiber. Dust particles can degrade performance. Put caps on any fiber connectors that are not
used.
If you will not perform node acceptance tests for this site, complete the
Step 5
Cables for OSC Link Terminations Between Two Adjacent Nodes" task on page
continue with
Step 6
On the front of the fiber-storage tray (usually installed below the node you are fibering), push the tabs
on the left and right sides inward to release the lock on the tray.
Pull the fiber-storage tray away from the shelf until it is fully opened.
Step 7
Step 8
Open the fold-down door that at the bottom of the shelf assembly to expose the cable-routing channel
(Figure 15-35 on page
Using the Cisco MetroPlanner Internal Connection table, install the fiber-optic cables. Steps provided in
Step 9
the following tasks can be used as general guidelines; however, the fiber-optic cabling at your site will
probably differ from the examples shown in the tasks.
DLP-G66 Install Fiber-Optic Cables for a Hub Node, page 3-54
DLP-G67 Install Fiber-Optic Cables for a Terminal Node, page 3-56
DLP-G68 Install Fiber-Optic Cables for a Line Amplifier Node, page 3-58
DLP-G69 Install Fiber-Optic Cables for an OSC Regeneration Node, page 3-60
DLP-G70 Install Fiber-Optic Cables for an Amplified or Passive OADM Node, page 3-63
DLP-G71 Install Fiber-Optic Cables for an ROADM Node, page 3-68
To close the fiber-storage tray, push the tray back toward the rack until it locks into place.
Step 10
Stop. You have completed this procedure.
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
3-50
"NTP-G115 Clean Fiber Connectors" procedure on page 13-25
Step
6.
15-37).
Chapter 3
Turn Up a Node
for all fiber connections,
"DLP-G65 Install Fiber-Optic
3-51. Otherwise,