Example For Configuring Sla; Figure 9-6 Sla Test Networking - Raisecom ISCOM2600G-HI (A) Series Configuration Manual

Table of Contents

Advertisement

Raisecom
ISCOM2600G-HI (A) Series Configuration Guide

9.4.12 Example for configuring SLA

Networking requirements
As shown in Figure 9-6, SLA is deployed on the Switch, and is periodically scheduled to test
the network performance between Switch A and Switch C.

Figure 9-6 SLA test networking

Configuration steps
Step 1 Configure CFM on the Switch.
For details, see section 9.3.13 Example for configuring CFM.
Step 2 Configure y1731-pkt-loss operation on Switch C, and enable operation scheduling.
Switch_C#config
Switch_C(config)#sla 2 y1731 pkt-loss remote-mac 000e.5e00.0001 level 3
svlan 3
Switch_C(config)#sla schedule 2 life 20 period 10
Checking results
Use the show sla configuration command on Switch C to show SLA configurations.
Raisecom#show sla 2 configuration
------------------------------------------------------------------------
Operation <2>:
------------------------------------------------------------------------
Type:
Frame Type:
Schedule Starttime:
CoS:
Raisecom Proprietary and Confidential
Copyright © Raisecom Technology Co., Ltd.
ETH-Y1731-PKT-LOSS
SLM
0
days, 00:00:00
7
9 OAM
392

Advertisement

Table of Contents
loading

Table of Contents