Riso ComColor X1 series Technical Manual page 295

Hide thumbs Also See for ComColor X1 series:
Table of Contents

Advertisement

Assembly Precautions
1)
At the markings on the Ink drainage tube, 75mm and 290mm from where the tube connects to the Overflow
pan, fix the Ink drainage tube on metal brackets on the machine with plastic bands as shown on the sketch
below.
Waste ink tube running from the Overflow pan
The tube goes over the metal bracket and held by plastic band.
2)
Using the new tubes supplied with the new Overflow pan, replace the tubes on the machine.
Ink drainage tubes under the Heat exchanger tower. (4 pcs)
Air tube between the Common air chamber and Air valve of the Negative pressure ink tank. (1 pc)
Air tube of the Bellows unit. (1 pc)
3)
With all the removed parts and components assembled back on the machine, fill the machine with the ink
following the instruction give on the "Initial Ink filling" in this Chapter.
The tube goes under the metal bracket and held by plastic band.
[ 11A-83 ]
Ink Flow Section
ComColor Series (Revision 2.4)

Advertisement

Table of Contents
loading

Table of Contents