SIDE MOLDINGS
INSTALLATION
1) Bonding surfaces should be cleaned thoroughly.
2) Follow illustrated bonding positions to install side moldings.
3) If adequate adhesive force is not available, use urethane adhe-
sive.
Clearance"a": 2 – 3 mm (0.04 – 0.07 in.)
"b": 0 – 1 mm (0 – 0.04 in.)
BODY SERVICE 9-45
1. Front door molding
2. Rear door molding
3. Quarter outer molding
4. Front door outer R/L
5. Front door outer panel