Working Example - Leica TPS1200 series Technical Reference Manual

Hide thumbs Also See for TPS1200 series:
Table of Contents

Advertisement

50.6
Description
Diagram
Requirements
Field procedure step-
by-step
Survey Cross Section

Working Example

Application:
Goal:
a
e
d
b c
GPS12_167
A codelist containing the codes TB1, BB1, BB2, EB1, CL, EB2, BB3, BB4 and TB2 has
been created in LGO and loaded onto the receiver.
The following table explains the most common settings. Refer to the stated chapter for more
information on screens.
Surveying a road, taking the same cross sections at particular
intervals.
The points of each cross section are to be picked up.
Codes are assigned automatically. The codes are shown in the
diagram.
Each new cross section is started at the same end as where the
previous cross section finished.
a) Top of bank 1, TB1
b) Bottom of bank 1, BB1
c) Bottom of bank 2, BB2
i
d) Edge of bitumen 1, EB1
f
e) Center line, CL
f) Edge of bitumen 2, EB2
g) Bottom of bank 3, BB3
g h
h) Bottom of bank 4, BB4
i) Top of bank 2, TB2
TPS1200
1269

Advertisement

Table of Contents
loading

Table of Contents