Sets of Angles
Monitoring in progress
Calculations
Example
•
Data - 3 target points; 4 measure sets; Begin Date: 20.04.2002; Begin Time: 14:00:00;
End Date 23.04.2002; End Time 14:00:00; Interval 30 min
•
Results - The time taken to measure 4 sets of 3 target points in both faces is 10 minutes.
The measurements will start at 14:00:00 on 20.04.2002. At 14:10:00 the first measure-
ment set is complete. The instrument will wait until 14:30:00 for the next scheduled meas-
urement set.
This screen displays a notice that monitoring is in progress.
Refer to "44.2 Sets of Angles" for information about calculations and the viewing of results.
TPS1200
ABORT (F6)
To stop the monitoring process and return to
the SETS Sets of Angles Menu screen.
1088