Figure 1-18 Installing Standoffs And The Aep; Figure 1-19 Aep Wire-Wrap Connections To Backplane Pins - Cisco ONS 15454 DWDM Installation And Operation Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

DLP- G19 Turn On and Verify Office Power

Figure 1-18 Installing Standoffs and the AEP

Insert and tighten three screws to secure the AEP to the backplane.
Step 4
Connect the AEP cable to the backplane and AEP:
Step 5
Connect the 10 colored wires to the wire-wrap pins on the backplane.
a.
cable wires are connected.
Plug the other end of the AEP cable into AEP connector port. The brown pin is on the top.
b.

Figure 1-19 AEP Wire-Wrap Connections to Backplane Pins

Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
1-46
Wires
AEP cable
Connector
Table 1-2
White
Black
A
B
A
B
A
B
1
1
1
2
2
2
3
3
3
4
4
4
BITS
LAN
IN
FG1
FG2
FG3
FG4
Violet
Slate
Chapter 1
shows AEP and AIC-I signals that each wire carries
Orange
Yellow
A
B
A
B
A
B
1
7
ACO
2
8
3
5
9
4
6
10
ENVIRONMENTAL ALARMS
IN/OUT
IN
IN
FG5
FG6
Green
Brown
Blue
Red
Install the Shelf and Common Control Cards
Figure 1-19
A
B
A
A
B
A
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
MODEM
CRAFT
LOCAL ALARMS
VIS
FG7
FG8
FG9
FG10
shows where the
B
A
B
11
12
IN
AUD
FG11
FG12
September 2004

Advertisement

Table of Contents
loading

Table of Contents