Cisco ONS 15454 DWDM Installation And Operation Manual page 68

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

DLP- G1 Unpack and Verify the Shelf Assembly
Test Equipment (ETSI)
To install the ONS 15454 ETSI, you need the following test equipment.
NTP-G1 Unpack and Inspect the Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
Complete the
Step 2
Complete the
Step 3
Continue with the
Stop. You have completed this procedure.
DLP-G1 Unpack and Verify the Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
When you receive the ONS 15454 system equipment at the installation site, open the top of the box. The
Step 1
Cisco Systems logo designates the top of the box.
Step 2
Remove the foam inserts from the box. The box contains the ONS 15454 shelf (wrapped in plastic) and
a smaller box of items needed for installation.
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
1-6
Crimping tool—This tool must be large enough to accommodate the girth of the grounding lug when
you crimp the grounding cable into the lug.
Wire stripping tool
Voltmeter
Power meter (only for use with fiber optics)
Bit error rate (BER) tester for E1-N-14, E1-42, E3-12, DS3i-N-12, STM1E-12, and FMEC cards
This procedure explains how to unpack the ONS 15454 shelf assemblies
and verify their contents.
Pinned hex (Allen) key for front door
Required
Onsite
None
"DLP-G1 Unpack and Verify the Shelf Assembly" task on page
"DLP-G2 Inspect the Shelf Assembly" task on page
"NTP-G1 Unpack and Inspect the Shelf Assembly" procedure on page
This task removes the shelf assembly from the package.
None
Required
Onsite
None
Chapter 1
Install the Shelf and Common Control Cards
1-6.
1-7.
1-6.
September 2004

Advertisement

Table of Contents
loading

Table of Contents