Cisco ONS 15454 DWDM Installation And Operation Manual page 47

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

DLP-G1 Unpack and Verify the Shelf Assembly
DLP-G2 Inspect the Shelf Assembly
DLP-G3 Reverse the Mounting Bracket to Fit a 19-inch (482.6-mm) Rack (ANSI Only)
DLP-G4 Install the External Brackets and Air Filter (ANSI Only)
DLP-G5 Mount the Shelf Assembly in a Rack (One Person)
DLP-G6 Mount the Shelf Assembly in a Rack (Two People)
DLP-G7 Mount Multiple Shelf Assemblies in a Rack
DLP-G8 Install the Air Ramp
DLP-G9 Open the Front Cabinet Compartment (Door)
DLP-G10 Remove the Front Door
DLP-G11 Open the FMEC Cover
DLP-G12 Remove the FMEC Cover
DLP-G13 Remove the Lower Backplane Cover
DLP-G14 Remove the Backplane Sheet Metal Cover
DLP-G15 Connect the Office Ground to the ONS 15454 ETSI
DLP-G16 Connect the Office Ground to the ONS 15454 ANSI
DLP-G17 Connect Office Power to the ONS 15454 ETSI
DLP-G18 Connect Office Power to the ONS 15454 ANSI
DLP-G19 Turn On and Verify Office Power
DLP-G20 Install Alarm Wires on the MIC-A/P (ETSI Only)
DLP-G21 Install Timing Wires on the MIC-C/T/P (ETSI Only)
DLP-G22 Install LAN Wires on the MIC-C/T/P (ETSI Only)
DLP-G23 Install Alarm Wires on the Backplane (ANSI Only)
DLP-G24 Install Timing Wires on the Backplane (ANSI Only)
DLP-G25 Install LAN Wires on the Backplane (ANSI Only)
DLP-G26 Install the TL1 Craft Interface (ANSI Only)
DLP-G27 Install the DCU Shelf Assembly
DLP-G28 Install the Fiber Patch Panel Shelf
DLP-G29 Install the Fiber Storage Shelf
DLP-G30 Install the FlexLayer Shelf
DLP-G31 Install the FlexLayer Modules
September 2004
1-6
1-7
1-16
1-19
1-20
1-21
1-24
1-25
1-26
1-27
1-39
1-58
1-67
1-68
1-68
1-69
1-69
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
1-11
1-13
1-15
1-32
1-33
1-35
1-37
1-48
1-51
1-52
1-53
1-56
1-57
T A S K S
1-10
xlvii

Advertisement

Table of Contents
loading

Table of Contents