NTP-G76 Verify Span Loss

10.
11.
12.
13.
14.
NTP-G76 Verify Span Loss
Purpose
Tools/Equipment
Prerequisite Procedures All procedures in
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Step 2.
Perform the following span loss verification tasks as needed:
Step 2
Stop. You have completed this procedure.
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
9-2
NTP-G85 Modify or Delete Communications Channel Terminations and Provisionable Patchcords,
page
9-28—Complete this procedure as needed to modify or delete generic communications channel
(GCC) and optical service channel (OSC) terminations, and provisionable patchcords.
NTP-G86 Convert a Pass-Through Connection to an Add/Drop Connection, page
this procedure as needed to convert a pass-through connection to an add/drop connection.
NTP-G87 Change Node Timing Parameters, page
NTP-G88 Modify Users and Change Security, page
make changes to user settings, including security level and security policies, and to delete users.
NTP-G89 Change SNMP Settings, page
This procedure verifies the span loss between two DWDM nodes using
CTC. You perform this procedure after a node or network modification has
occurred and you want to verify that the span loss between the nodes have
not changed.
A node provisioning plan prepared by Cisco MetroPlanner is required.
As needed
Onsite or remote
Superuser
"DLP-G46 Log into CTC" task on page
Complete the
"DLP-G155 Verify Optical Span Loss Using CTC" task on page 9-3
using CTC. This task is faster than a span loss measurement using an optical time domain
reflectometer (OTDR) and does not require fibers to be removed. However, the resolution is not as
precise as an OTDR measurement.
Complete
"DLP-G156 Measure Span Insertion Loss Using an OTDR" task on page 9-4
the span loss using an OTDR.
9-32—Complete as needed.
9-34—Complete this procedure as needed to
9-42—Complete as needed.
Chapter 3, "Turn Up a Node."
2-25. If you are already logged in, continue with
Chapter 9
Manage the Node
9-31—Complete
to check span loss