Chapter 3
Turn Up a Node
Written slot plan. The plan must be based on the Cisco MetroPlanner Site Dialog window for your
installation.
Remove the TXP or MXP card from its packaging, then remove the protective clips from the backplane
Step 2
connectors.
Open the card latches/ejectors.
Step 3
Use the latches/ejectors to firmly slide the TXP or MXP card along the guide rails until the card plugs
Step 4
into the receptacle at the back of the slot.
Note
Step 5
Verify that the card is inserted correctly and close the latches/ejectors on the card.
Note
Verify the LED activity:
Step 6
The red FAIL LED turns on for 20 to 30 seconds.
The red FAIL LED blinks for 35 to 45 seconds.
All LEDs blink once and turn off for 5 to 10 seconds.
The ACT or ACT/STBY LED turns on. The SF LED can persist until all card ports connect to their
far-end counterparts and a signal is present.
If the card does not boot up properly, or the LED activity does not mirror
Step 7
When a physical card type does not match the type of card provisioned for that slot in CTC, the card
might not boot. If a TXP or MXP card does not boot, open CTC and ensure that the slot is not
provisioned for a different card type before assuming that the card is faulty.
If the red FAIL LED does not turn on, check the power.
If you insert a card into a slot provisioned for a different card, all LEDs turn off.
If the red FAIL LED is on continuously or the LEDs behave erratically, the card is not installed
properly. Remove the card and repeat Steps
If the TXP or MXP requires a small-form pluggable (SFP), complete the
Step 8
on page
Note
Stop. You have completed this procedure.
September 2004
If you install the wrong card in a slot, complete the
Cards" procedure on page
It is possible to close the latches and ejectors when the card is not completely plugged into the
backplane. Ensure that you cannot insert the card any further.
3-32. To remove an SFP, complete the
SFPs must be provisioned in CTC. You will be directed to the
Port Modules" procedure on page 10-29
SFPs, see the
"14.13 SFP Modules" section on page
NTP-G32 Install the Transponder and Muxponder Cards
11-12.
3
to 6.
"DLP-G64 Remove an SFP" task on page
during network turn up. For more information about
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
"NTP-G107 Remove and Replace DWDM
Step
6, check the following:
"DLP-G63 Install an SFP" task
"NTP-G94 Provision Pluggable
14-123.
3-32.
3-31