NTP-G41 Perform the Terminal and Hub Node with 32MUX-O and 32DMX-O Cards Acceptance Test
8.
9.
10.
NTP-G41 Perform the Terminal and Hub Node with 32MUX-O
and 32DMX-O Cards Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
This procedure tests the west side of hub nodes first, then the east side. If you are testing a terminal node,
Note
apply instructions for the west side of the hub node to the terminal side (east or west) of the terminal
node.
Complete the
Step 1
test. If you are already logged in, continue with
From the View menu, choose Go to Network View.
Step 2
Click the Alarms tab.
Step 3
a.
b.
In node view, click the Provisioning > WDS-ANS > Port Status tabs. Verify that all statuses under
Step 4
Link Status are listed as Success - Changed, Success - Unchanged, or Not Applicable. If any are not,
complete the
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
4-2
NTP-G48 Perform the Symmetric OADM Node with OSCM Cards Acceptance Test, page
4-16—Complete this procedure to test symmetric OADM nodes with OSCM cards.
NTP-G49 Perform the Symmetric OADM Node with OSC-CSM Cards Acceptance Test, page
4-18—Complete this procedure to test symmetric OADM nodes with OSC-CSM cards.
NTP-G50 Perform the Symmetric Passive OADM Node with OSC-CSM Cards Acceptance Test,
page
4-20—Complete this procedure to test symmetric passive OADM nodes with OSC-CSM cards.
This procedure tests a DWDM terminal or hub node with 32MUX-O and
32DMX-O cards.
Chapter 3, "Turn Up a Node."
Required
Onsite
Superuser
"DLP-G46 Log into CTC" task on page 2-25
Verify that the alarm filter is not on. See the
as necessary.
Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve
them before continuing. Refer to the Cisco ONS 15454 SONET and DWDM Troubleshooting Guide
for procedures.
If OSC terminations are created, there will be two alarms, one for low power on the Optical
Note
Booster (OPT-BST) card, and the other an OSC channel alarm.
"NTP-G37 Run Automatic Node Setup" procedure on page
A tunable laser
An optical power meter or optical spectrum analyzer
2 bulk attenuators (10 dB) LC
Step
2.
"DLP-G128 Disable Alarm Filtering" task on page 7-32
Chapter 4
Perform Node Acceptance Tests
at the hub or terminal node that you want to
3-58.