Dlp-G19 Turn On And Verify Office Power - Cisco ONS 15454 DWDM Installation And Operation Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

Chapter 1
Install the Shelf and Common Control Cards
Step 7
Terminate the return 1 lead to the RET1 backplane terminal. Use oxidation-prevention grease to keep the
connections noncorrosive.
Do not secure multiple connectors with the same bolt assembly.
Warning
Terminate the negative 1 lead to the negative BAT1 backplane power terminal. Use oxidation prevention
Step 8
grease to keep connections noncorrosive.
If you use redundant power leads, terminate the return 2 lead to the positive RET2 terminal on the
Step 9
ONS 15454. Terminate the negative 2 lead to the negative BAT2 terminal on the ONS 15454. Use
oxidation-preventative grease to keep connections noncorrosive.
Route the cables out below the power terminals using the plastic cable clamp, as shown in
Step 10
on page
Return to your originating procedure (NTP).
Step 11

DLP-G19 Turn On and Verify Office Power

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Do not apply power to the shelf assembly until you complete all installation steps.
Caution
Using a voltmeter, verify the office battery and ground at the following points on the fuse and alarm
Step 1
panel:
a.
b.
September 2004
1-38.
This task measures the power to verify correct power and returns for the
ONS 15454 shelf.
Voltmeter
DLP-G15 Connect the Office Ground to the ONS 15454 ETSI, page 1-32
DLP-G17 Connect Office Power to the ONS 15454 ETSI, page 1-35
DLP-G16 Connect the Office Ground to the ONS 15454 ANSI, page 1-33
DLP-G18 Connect Office Power to the ONS 15454 ANSI, page 1-37
Required
Onsite
None
To verify the power, place the black test lead of the voltmeter to the frame ground. Place the red test
lead on the A-side connection and verify that it is between –40.5 VDC and –57 VDC. Place the red
test lead on the B-side connection and verify that it is between –40.5 VDC and –57 VDC.
Note
The voltages –40.5 VDC and –57 VDC are, respectively, the minimum and maximum
voltages required to power the chassis.
To verify the ground, place the black test lead of the voltmeter to the frame ground. Place the red
test lead on the A-side return ground and verify that no voltage is present. Place the red test lead on
the B-side return ground and verify that no voltage is present.
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
DLP- G19 Turn On and Verify Office Power
Figure 1-14
1-39