Hole Punch Unit (Mj-6103/6104) - Toshiba e-STUDIO206L Service Manual

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO206L:
Table of Contents

Advertisement

7.7.18

Hole punch unit (MJ-6103/6104)

Items to check*1
1
Transport roller
2
Sensors
3
Drive gears
4
Punched scrap container
5
Punching unit
*4
*1: Perform maintenance in the timing of preventive maintenance of the equipment.
*2: Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
*3: Page-Item (P-I) is described in the column of the Parts list.
*4: This unit may require replacement once or more over the period of machine warranty because of
deterioration or damage. Replace them as needed.
© 2011-2014 TOSHIBA TEC CORPORATION All rights reserved
Lubrication
Cleaning
*2
A
B
W3
Dispose of
the
punched
paper bits.
e-STUDIO206L/256/306/356/456/506 / 207L/257/307/357/457/507
7 - 45
Replacement
Operation
(x1,000)
check
O
O
R1
1000
PREVENTIVE MAINTENANCE (PM)
Parts list
(P-I)
*3
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents