Checking The Installation Site Prerequisites; Preparing The Required Tools - AGFA CR 30-X Service Manual

Type 5175/100/105/110/120/125
Hide thumbs Also See for CR 30-X:
Table of Contents

Advertisement

DD+DIS150.06E
2.1

Checking the Installation Site Prerequisites

(1)
Confirm that all prerequisites described in the "Installation readiness checklist"
are fulfilled.
This checklist is available at the end of CR 30-X Service Documentation
Chapter 11, Installation Planning.
2.2

Preparing the required Tools

Following tools are required during the installation procedure:
REQUIRED TOOLS:
*The last digit in the spare part number indicates the spare part revision at release of this document.
When ordering, the actual revision of the spare part is delivered.
The controlled version of this document resides on MedNet. Any printed copy of this document is uncontrolled.
Edition 1, Revision 5
11-2009
Controls, Connections, and Setup Procedures
3 mm
USB Stick
(checked to be virus free)
DOCUMENT CONTROL NOTE:
CR 30-X
Type 5175 / 100/110
cutter
Agfa Company Confidential
Chapter 1 / 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents