R&S ESU Series Operating Manual page 79

Emi test receiver
Table of Contents

Advertisement

R&S ESU
In the
ESH2-Z5 | ESH3-Z5 |
ENV 4200 | ENV 216 |
OFF
PRESCAN PHASES |
FINAL PHASES
RUN FINAL MEAS
ESH2-Z5 |
The ESH2-Z5, ESH3-Z5, ENV 4200, ENV 216 and OFF softkeys allow to select the
ESH3-Z5 |
V-network to be controlled via the user port.
ENV 4200 |
ESH2-Z5
ENV 216 |
ESH3-Z5
OFF
ENV 4200
ENV 216
OFF
Remote command:
PRESCAN
The PRESCAN PHASES and FINAL PHASES softkeys open the submenu for the
PHASES |
selection of phase and protective earth setting.
FINAL PHASES
PRESCAN PHASES: Softkeys ESH2-Z5, ESH3-Z5, ENV 4200, ENV 216 and
FINAL PHASES:
PHASE N |
The PHASE N, PHASE L1, PHASE L2 and PHASE L3 softkeys select the phase of
PHASE L1 |
the V-network on which the RFI voltage is to be measured.
PHASE L2 |
PHASE N
PHASE L3
PHASE L1
PHASE L2
PHASE L3
Remote command:
4.48
FINAL MEAS
side menu, the following softkeys are available:
PHASE N | PHASE L1 |
!
PHASE L2 | PHASE L3
150 KHZ HIGHPASS
PE GROUNDED | PE
FLOATING
!
HOLD FINAL MEAS
STOP FINAL MEAS
four-line V-network is controlled.
two-line V-network is controlled.
four-line V-network is controlled.
two-line V-network is controlled.
remote control is deactivated.
:INPut:LISN[:TYPE] TWOPhase| FOURphase|
ENV4200 | ENV216 | OFF
OFF or PHASE N, PHASE L1, PHASE L2 and PHASE
L3 as well as PE GROUNDED and PE FLOATING are
toggle keys. Only one of them can be activated at a time.
All combinations of phases and PE setting are possible.
RFI on phase N is measured,
RFI on phase L1 is measured,
RFI on phase L2 is measured
(only for ESH2-Z5/ENV 4200),
RFI on phase L3 is measured
(only for ESH2-Z5/ENV 4200).
:INP:LISN:PHAS L1 | L2 | L3 | N
Instrument Functions
!
AUTOMATIC FINAL
INTER ACTIVE
MEASURE
STOP FINAL MEAS
Operating Manual 1302.6163.12 - 03
Receiver Mode

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents