Installing Double-Reel U-Joint - MacDon FlexDraper FD1 Series Operator's Manual

Combine header
Hide thumbs Also See for FlexDraper FD1 Series:
Table of Contents

Advertisement

Installing Double-Reel U-Joint

NOTE:
It may be necessary to move the right reel sideways so that the U-joint can clear the reel tube.
1. Position U-joint flange (B) onto driven sprocket (C) as
shown. Install six bolts (A) and hand-tighten. Do NOT
torque the bolts.
2. Position the right reel tube against the reel drive and
engage the stub shaft into the U-joint pilot hole.
3. Rotate the reel until the holes in the end of the reel tube
and U-joint flange (B) line up.
4. Apply medium-strength threadlocker (Loctite
equivalent) to four 1/2 in. bolts (A) and secure with lock
washers.
5. Torque to 102–115 Nm (75–85 lbf∙ft).
6. Remove temporary reel support (A).
7. Install the drive cover. Refer to
Cover, page
527.
214683
MAINTENANCE AND SERVICING
®
243 or
Installing Reel Drive
533
C
A
Figure 5.289: U-Joint
B
Figure 5.290: U-Joint
A
Figure 5.291: Supporting Reel
B
A
Revision A

Advertisement

Table of Contents
loading

Table of Contents