Part Names And Functions - Panasonic ZEQUO 2200 Operating Instructions Manual

Switching hub
Table of Contents

Advertisement

1.4.

Part Names and Functions

● Power port
Connect the supplied power cord into the port and connect the other end into an
electric outlet.
● Power cord hook block
Hooking the supplied power cord on the block makes the cord less likely to be
unplugged from the power port.
● Ground terminal
Connect the earth terminal screw and grounding surface using the earth wire.
● SD card slot
Insert a SD card to change configuration information and change and save firm-
ware.
● 10BASE-T/100BASE-TX/1000BASE-T port (Ports 1 to 28)
Connect a 10BASE-T/100BASE-TX/1000BASE-T terminal hub repeater Switching
Hub. The length of the copper cabling (CAT5e or higher) connecting this Switching
Hub and a device must be 100 m or shorter.
Fig. 1-1 Back, Front, LEDs
13
1. Product Outline

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pn26241Zequo 2210 pn26161

Table of Contents