Advertisement

Quick Links

Installation Guide
 Thank you for purchasing our product.
 This manual provides important information about safe and proper
operations of this Ethernet Switch.
 Please read the "Important Safety Instructions" on pages 3 to 5.
 Any problems or damages resulting from disassembly of this Ethernet Switch
by customers are not covered by the warranty.
 The instruction manuals (Web Version and CLI Version), latest
firmware and SDN application (ZEQUO assist Plus) can be
downloaded from the following URL.
https://panasonic.co.jp/ew/pewnw/english/datadownload/index.html
Panasonic Electric Works Networks Co.,Ltd.
2-12-7, Higashi-Shimbashi, Minato-ku, Tokyo Japan, 105-0021
©
Panasonic Electric Works Networks Co.,Ltd. 2022
ZEQUO 6700RE
Model No.
I1017-20122
PN36243E-TH
PN36243E-MY
PN36243E-ID
PN36243E-SG
PN36243E-NZ
Printed in Japan

Advertisement

Table of Contents
loading

Summary of Contents for Panasonic ZEQUO 6700RE

  • Page 1  The instruction manuals (Web Version and CLI Version), latest firmware and SDN application (ZEQUO assist Plus) can be downloaded from the following URL. https://panasonic.co.jp/ew/pewnw/english/datadownload/index.html Panasonic Electric Works Networks Co.,Ltd. 2-12-7, Higashi-Shimbashi, Minato-ku, Tokyo Japan, 105-0021 © Panasonic Electric Works Networks Co.,Ltd. 2022 I1017-20122 Printed in Japan...
  • Page 2: Table Of Contents

    Contents Important Safety Instructions Basic Instructions for the Use of This Product 1. Product Outline 1.1 Features 1.2 Specifications 1.3 Accessories 1.4 Basic operation 2. Part Names and Functions 3. Installation and Configuration 3.1 Removing, Mounting, and Replacing the Power Modules 3.2 Removing, Mounting, and Replacing the Fan Modules 3.3 Grounding Cable Connection 3.4 Installing on level shelves...
  • Page 3: Important Safety Instructions

    Important Safety Instructions This chapter contains important safety instructions for preventing bodily injury and/or property damage. Please read carefully, and follow them at all times.  Severity of bodily injury and/or property damage, which could result from incorrect use of the Ethernet Switch, are explained below. WARNING This symbol indicates a potential hazard that could result in serious injury or death.
  • Page 4 CAUTION Do not connect any other devices except for 10BASE-T/100BASE-TX/1000BASE-T  devices to the twisted pair ports. Deviation could lead to equipment failure. Do not insert any other modules except for our optional SFP module  (PN54021K/PN54023K) and the SFP+ module (PN59021/PN59023) to the SFP+ extension slots.
  • Page 5 CAUTION Check whether the optical fiber cable connectors are contaminated with dust, etc.  This might cause the optical signal to not be transmitted normally, and cause misoperations and malfunctions. If they are contaminated, make sure to clean them off, then connect them to the optical fiber ports. This Ethernet Switch is to be periodically serviced in order to maintain its ...
  • Page 6: Basic Instructions For The Use Of This Product

     Select the appropriate cables and lay them. Communications might be affected by how the cables are laid, and environmental noise. 1. Please note that Panasonic shall not bear any liability whatsoever for any damages (this shall include, but is not limited to, lost earnings, lost opportunities, etc.)
  • Page 7: Product Outline

    Product Outline The ZEQUO 6700RE is a Layer 3 all giga Ethernet Switch equipped with management functions that has 24 SFP expansion ports, 4 10/100/1000BASE-T ports, 4 SFP+ expansion ports and 2 40G stack ports. 1.1 Features  Has wire-speed Layer 3 switching function.
  • Page 8: Specifications

    Product Outline 1.2 Specifications Interface SFP extension slots 1 - 24 Transmission system: IEEE802.3z 1000BASE-SX/1000BASE-LX SFF-8472 (DMI: Diagnostic Monitoring Interface) Twisted-pair ports 21 - 24 RJ-45 connectors Transmission system: IEEE 802.3  10BASE-T   IEEE 802.3u  100BASE-TX   IEEE 802.3ab 1000BASE-T SFP+ extension slots 25 - 28 Transmission system: IEEE802.3z 1000BASE-SX/1000BASE-LX...
  • Page 9 Management DHCP relay agent, DHCP server, Console, TELNET, SSH, WEB SNMPv1/v2c/v3, ZEQUO assist Plus Power supply AC 100-240 V, 50/60 Hz, 2.5 A Power consumption When either power port 1, or power port 2 is connected Normally, Max. 51.52 W, Min. 32.52 W When both power port 1 and power port 2 are connected Normally, Max.
  • Page 10: Accessories

    Product Outline 1.3 Accessories Please be sure to confirm the content. Please contact our distributor if any of the contents are insufficient. Quantity  Installation Guide (this document) 1 (*) Rubber foot  Mounting bracket (for 19-inch rack)  Screw (for 19-inch rack) ...
  • Page 11: Basic Operation

    Port LED lights up. When the terminal is not operating normally, for example when power is not supplied to the terminal, the Port LED does not light up. For configuration and management method, please see the PDF version Operating Instructions on Panasonic’s website.
  • Page 12: Part Names And Functions

    Part Names and Functions Fan module slot 1 Fan module slot 2 Power module slot 1 MAC Address label Power cord hook block Back panel Ground terminal Serial number label Power module slot 2 10BASE-T/100BASE-TX/1000BASE-T port SFP extension slot Stacking port Front panel SD card slot Console port...
  • Page 13 Port LED POWER1 LED POWER2 LED STACK ID LED  POWER1 LED and POWER2 LED Green Light : Power is ON. : Power is OFF. Or, an internal power fault.  STATUS LED Green Light : The system is normally operating. Green Blink : There’re one or some ports which are within 3 days after a loop resolution Orange Light...
  • Page 14 Part Names and Functions  Port LED (SFP+ port 25-28) Green Light : Link is established at 1000 Mbps or 10 Gbps. Green Blink : Transmitting and receiving data at 1000 Mbps or 10 Gbps. Orange Light : Shuts off due to loop detection and shutoff functions/storm controls/ BPDU guard Orange Blink : Transmitting and receiving just the administration packets...
  • Page 15: Installation And Configuration

     Identify the power modules which are to be replaced via the ZEQUO 6700RE unit’s CLI, and power status LEDs, then replace them If replacing is done without identifying them, unintended modules might be replaced.
  • Page 16 Installation and Configuration  Removing the power module Step 1. Unplug the power cord from the power module which is going to be replaced and removed, and shut off the power. Step 2. Make sure that the power status LED of the power module and the POWER1 LED, the POWER2 LED or both LEDs of the Ethernet switch itself are turned off.
  • Page 17: Removing, Mounting, And Replacing The Fan Modules

     For the fan modules, be sure to use stipulated fan modules (PN73002 FAN02 Module) which are sold by the Panasonic Electric Works Networks Co., Ltd. If stipulated fan modules are not used, the unit will be included as being not covered by the warranty, furthermore, that might cause the unit to malfunction.
  • Page 18 Installation and Configuration  Removing the fan module Step 1. Loosen the retainer screws on the fan modules which are going to be replaced and removed. Step 2. Hold the fan module’s handle (silver), and slowly pull out fan module while supporting it.
  • Page 19: Grounding Cable Connection

    3.3 Grounding Cable Connection The chassis of the equipment must be grounded properly so that the lightning can flow to the ground, which improves the capability of the chassis for resisting the electromagnetic interference. 1. Ensure that the grounding cable is connected correctly so that the equipment is protected against lightning and interference.
  • Page 20: Installing On Level Shelves

    Installation and Configuration 3.4 Installing on level shelves (1) Apply the supplied rubber feet onto the bottom surface of the unit. (2) Install in a level area. Caution Bottom surface - Do not stack and use. Set up with a clearance of 20 mm or more.
  • Page 21: Configuration Of Ip Address (Basic)

    3.6 Configuration of IP address (Basic) (1) Connect this Ethernet Switch and PC with a RJ45–DSub 9-pin console cable and start up the terminal emulator (ZEQUO assist Plus, etc.). (2) Pressing Enter key 1 time opens Login screen. Enter UserName and Password (the default is "manager"...
  • Page 22 Installation and Configuration For detailed settings and administration methods, please see the PDF version of the Operating Instructions on Panasonic’s website. - Detailed configuration and management methods using the CLI. - Configuration and management method from ZEQUO assist Plus.
  • Page 23: Troubleshooting

    Troubleshooting If you find any problem, please take the following steps to check.  LED The POWER 1 LED, or POWER 2 LED is not lit. Is the power plug connected?  Check that the power plug is firmly connected, so the connection is not loose at the power port.
  • Page 24  Are all of the firmware versions for the devices that are connected to the stacks  identical? * Please refer to the instruction manual on the ZEQUO assist Plus on Panasonic’s website in regard to settings and management methods.

Table of Contents