ABB IRB 930 Product Manual page 474

Table of Contents

Advertisement

5 Repair
5.7.4 Replacing the axis-4 motor sub-assembly
Continued
2
3
Continues on next page
474
Action
Refit the bracket.
Tip
Do not secure it with the screws before the cable
ferrule installed well.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Secure the cable ferrule to the bracket with the
screws.
Tip
The air hoses should face the process hub side.
Tip
The position with wrapped tape is the marked
position for the cable ferrule.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
© Copyright 2023 ABB. All rights reserved.
Note
Screws: Hex socket head cap
screw M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Tightening torque: 2.4 Nm ±10%
xx2300000497
Screws: Hex socket head cap
screw M3x8 12.9 Lafre 2C2B/FC6.9
(2 pcs)
Tightening torque: 2.4 Nm ±10%
xx2300000496
Product manual - IRB 930
3HAC086009-001 Revision: A

Advertisement

Table of Contents
loading

Table of Contents