ABB IRB 930 Product Manual page 344

Table of Contents

Advertisement

5 Repair
5.6.6 Replacing the axis-4 timing belt
Continued
2
3
Disconnecting the connectors for axis-3 motor
1
2
Continues on next page
344
Action
Disconnect the connectors.
R2.MP2
R2.FB2
Snap loose and remove the female head of the
connectors from the bracket.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Disconnect the connectors.
R2.MP3
R2.FB3
© Copyright 2023 ABB. All rights reserved.
Note
xx2300000490
xx2300000493
Note
xx2300000491
Product manual - IRB 930
3HAC086009-001 Revision: A

Advertisement

Table of Contents
loading

Table of Contents