ABB IRB 930 Product Manual page 316

Table of Contents

Advertisement

5 Repair
5.6.4 Replacing the ball screw
Continued
Removing the pulley on the ball screw upper position
1
2
3
4
Removing the ball screw flange
1
2
3
Continues on next page
316
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page
Remove the screws.
Remove the pulley carefully.
Tip
Hold the ball screw to prevent it from dropping.
Or the ball screw may be destroyed.
CAUTION
If the ball screw nut or ball screw spline nut go
out of the screw shaft, the ball screw is destroyed.
Be careful when you do any work that may cause
this.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the screws.
Remove the ball screw flange from the ball screw
shaft.
CAUTION
If the ball screw nut or ball screw spline nut go
out of the screw shaft, the ball screw is destroyed.
Be careful when you do any work that may cause
this.
© Copyright 2023 ABB. All rights reserved.
Note
The
46.
xx2300000566
Note
xx2300000590
Product manual - IRB 930
3HAC086009-001 Revision: A

Advertisement

Table of Contents
loading

Table of Contents