ABB IRB 6640 Foundry Prime Product Manual page 366

Table of Contents

Advertisement

4 Repair
4.6.4 Replacing motor axis 4
Continued
13
14
15
16
Preparation of the upper arm housing before fitting the motor
Use this procedure for the preparation of the upper arm housing before refitting
motor axis 4.
1
2
3
Refitting motor axis 4
Use this procedure to refit motor axis 4.
1
2
Continues on next page
366
Action
If required, press the motor out of position
by fitting removal tool, motor to the remain-
ing holes.
Lift the motor up to get the pinion away from
the gear.
Disconnect the 24 VDC power supply.
Remove the motor by carefully lifting it
straight up.
Action
Grind the paint edge on the surface carefully
in order to get a smooth surface.
Clean the surface from contamination such
as oil and dirt.
Apply Loctite 574 on the surface as shown
in the figure.
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
to the robot, before entering the robot
working area.
Clean the joints that have been opened. See
Cut the paint or surface on the robot before
replacing parts on page 219
© Copyright 2011-2018 ABB. All rights reserved.
Note
For article number see:
Required equipment - tools etc. on
page 363
Always use removal tools in pairs.
Make sure the motor pinion is not dam-
aged!
Note
For article number see:
Additional equipment - Foundry
Prime on page 363
xx1000000617
Part:
A: Loctite 574
Note
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents