3 Maintenance
3.6.2 Rust preventive measures, bearing axis 1 (Foundry Prime)
3.6.2 Rust preventive measures, bearing axis 1 (Foundry Prime)
Location of bearing axis 1
The bearing axis 1 is located as shown in the illustration. (View from above).
xx0700000445
A
Required equipment
Equipment
Brush
Continues on next page
198
Cable guide
Art. no.
-
© Copyright 2011-2018 ABB. All rights reserved.
Note
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N