ABB IRB 6640 Foundry Prime Product Manual page 326

Table of Contents

Advertisement

4 Repair
4.5.4.2 Replacing balancing device (design 2)
Continued
28
29
326
Action
Fill the spherical roller bearing at the front
shaft with 20 ml, Optimol PDO.
Note
Open the ventilation screw M6 at the op-
posite side of the link ear.
Refit the M6 screw with sealing washers.
Seal and paint the joints that have been
opened. See
Cut the paint or surface on
the robot before replacing parts on
page 219
© Copyright 2011-2018 ABB. All rights reserved.
Note
xx0900000102
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents