ABB IRB 6640 Foundry Prime Product Manual page 242

Table of Contents

Advertisement

4 Repair
4.3.3 Replacement of complete arm system
Continued
Removal, arm system
Use this procedure to lift and remove the complete arm system.
1
2
3
Continues on next page
242
Action
Decide which calibration routine
to use, and take actions accord-
ingly prior to beginning the re-
pair procedure.
Run the robot to the position
shown in the figure to the right.
Run the overhead crane to a
position above the robot.
© Copyright 2011-2018 ABB. All rights reserved.
Note
Release the brakes if necessary, as detailed in section
Manually releasing the brakes on page
xx0700000351
Product manual - IRB 6640 Foundry Prime
78.
3HAC040586-001 Revision: N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents