Inspection Of Air Hoses (Foundry Prime) - ABB IRB 6620 Product Manual

Hide thumbs Also See for IRB 6620:
Table of Contents

Advertisement

3 Maintenance

3.3.13 Inspection of air hoses (Foundry Prime)

3.3.13 Inspection of air hoses (Foundry Prime)
Required equipment
Equipment, etc.
Leak detection spray
Pressure gauge
Cut off valve
Procedure
For this test it is recommended that the air supply to the robot has a pressure
gauge and a cut-off valve connected.
1
2
3
4
5
6
144
Action
Apply compressed air to the air connector on
robot base, and raise the pressure with the
knob until the correct value is shown on the
pressure gauge.
Close the cut off valve.
The time is < 5 seconds:
If the answer is YES: Localize the
leakage by following the procedures
below.
If the answer is NO: The system is OK.
Remove the leak testing equipment.
Pressurize by opening the cut off valve.
Spray suspected leak areas with leak detec-
tion spray.
Note
Bubbles indicate a leak.
When the leak is localized: correct the leak.
© Copyright 2006-2020 ABB. All rights reserved.
Art. no.
-
-
-
Note
Recommended pressure:
0.2-0.3 bar
It should take at least 5 seconds for the
pressure to reach 0 bar.