HayssenSandiacre Ultima SV 12-19HR Instruction Manual page 320

Table of Contents

Advertisement

Machine Synchronization
Synchronization
Electrical Cabinet
1
8
1 = Fuse
2 = Power Switch
3 = 24VDC Power Supply
4 = Terminal Block
5 = Synchronization Control Relays
6 = Control Relays
P
S
OWER
UPPLY
S
YNCHRONIZATION
C
R
ONTROL
ELAYS
C
R
ONTROL
ELAYS
CPU
120VAC O
UTLET
A
R
UGER
ELAYS
B
T
AGGER
ERMINAL
B
LOCKS
1 4 - 8 0 / R e v 1 5
2
3
4
10
9
11
Figure 43: Synchronization Electrical Cabinet Components
7 = CPU
8 = 120VAC Outlet
9 = Power Terminal Block
10 = Neutral Terminal Block
11 = Ground Terminal Block
12 = Auger Relay Master Bagger
24VDC power supply provides power to the synchronization electrical
system.
When enabled, communicates to the bagger to use the synchronization
signals instead of standard bagger signals.
Controls various functions in the synchronization process.
Stores the synchronization programming and controls the synchroniza-
tion process.
120VAC outlet power source located inside the electrical cabinet.
Controls the synchronization signals to the auger feed system.
Wiring connections from the bagger to the synchronization system.
H A Y S S E
5
16
14
18
12
13
15
17
13 = Master Bagger Terminal Block
14 = Auger Relay Slave #1
15 = Slave #1 Terminal Block
16 = Auger Relay Slave #2
17 = Slave #2 Terminal Block
18 = Auger Relay Slave #3
19 = Slave #3 Terminal Block
NSA N D I AC R E
6
7
19
®
U l t i m a S V

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF