HayssenSandiacre Ultima SV 12-19HR Instruction Manual page 102

Table of Contents

Advertisement

Unwind Assembly Setup and Operation Procedures
Threading Film
6 - 6 / R e v 1 5
8.
If spindle safety locks are installed, engage the locks on
each side
9.
Splice the new film to old film with tape, or thread film
through machine
10.
Engage the brake
11.
Reset the machine
This procedure assumes the machine is completely empty of film.
I
:
MPORTANT
Machine threading may vary. Refer to the threading diagram on
the inside of the unwind stand for specific threading instructions.
1.
Bring the machine to a controlled stop.
2.
Release the roll brake.
3.
Follow Removing a Depleted Film Roll procedure.
4.
Follow the Loading a Roll of Film procedure.
5.
Thread the film according the threading diagram.
6.
Engage the roll brake.
7.
Open the front doors of the bagger.
8.
Retract the platen.
9.
Disengage the pull belts.
10.
Thread the film through the forming tube.
a. slide the film up over the forming shoulder
Forming Tube Assembly With
One Roller Before Shoulder
Thread film over the top of the roller.
H A Y S S E
Two Rollers Before
Slide film over the first roller and
under the second as shown in the
illustration.
NSA N D I AC R E
®
Shoulder
U l t i m a S V

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF