TOHATSU BFT115A Service Manual page 672

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

CONTROLS
INSTALLATION
Apply marine grease to a new click arm bushing (1)
inner surface and install it to the click arm (2).
Apply marine grease to the shaft area (3) of the seal
holder and roller area (4) of the click arm.
Install the click spring (5) to the click arm by aligning the
hook A (6) of the click spring with the groove (7) of the
click arm.
Install the click spring hook B (8) into the hole (9) of the
seal holder, then set the washer (10) and tighten the
bolt (11).
Install the neutral switch (1) to the neutral switch
bracket (2) and tighten the nut to the specified torque.
TORQUE: 2.5 N·m (0.25 kgf·m, 1.8 lbf·ft)
Set the clip A (1) to the neutral switch wire (2) and
install it to the neutral switch bracket (3).
Connect the neutral switch 2P connector (4) and install
it to the connector bracket A (5).
Install the wire clip (6) of the starter cable (7) to the
neutral switch bracket.
Install the fuel tube holder (8) to the neutral switch
bracket.
20-10
(11)
(10)
(4)
(2)
(6)
(5)
(8)
(9)
(3)
(2)
(1)
(2)
(8)
(3)
(6)
(7)
(1)
(3)
(4)
(5)
(1)
(7)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents