TOHATSU BFT115A Service Manual page 340

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

OTHER ELECTRICAL
INSTALLATION
Connect the starter cable (+) 1P connector (1) and
install it to the connector bracket A (2).
Install the harness band clip (3) to the neutral switch
bracket (4).
Install the harness band clip (1) to the cable bracket B
(2).
Set the ground terminal (3) of the starter cable (–) as
shown and tighten the bolt (4) to the specified torque.
TORQUE: 26 N·m (2.7 kgf·m, 19 lbf·ft)
Install the harness band clip (1) to the electric parts
case.
Install the starter cable (+) (2), washer (3) and two nuts
(4) to the starter B terminal, then tighten the nuts to the
specified torque.
TORQUE: 11 N·m (1.1 kgf·m, 8 lbf·ft)
Set the starter cables (+) (1) to the fuse/relay junction
box (2) and tighten the bolts (3) to the specified torque.
TORQUE: 5 N·m (0.51 kgf·m, 3.7 lbf·ft)
Install the following:
– Under cover front bracket (page 6-18)
– Switch panel cable/indicator wire harness (page 10-
6)
10-10
(4)
(3)
(2)
(1)
(3)
(4)
(3)
(3)
(1)
(2)
(1)
(4)
(2)
(1)
(2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents